4.2 Consultation mechanisms

Equipment, Support, and Technology for UK Defence and Security: A Consultation Paper – Part Four – Consultation – 4.2 Consultation mechanisms

4.2.1 Duration

The consultation period starts 5 January 2011 and ends 31 March 2011 (12 weeks)

→ Read more

4.2.2 How to respond

You are able to respond online at www.defenceconsultations.org.uk/ A PDF consultation document will also be available to download online at http://defenceconsultations.org.uk/Cm7989.pdf and hard copy responses should be sent to: Green Paper Responses DGDC 5.N.25 MOD Main Building Whitehall London SW1A 2HB E-mail: DGDCSecIP-Consultation@mod.uk Please contact the MOD (above) if you require information in another format, [...]

→ Read more

4.2.3 After the Consultation

Responses to the wider elements of the consultation period will be summarised and considered as part of further policy development. The resulting White Paper will be published in 2011.

→ Read more

4.2.4 Confidentiality disclosure

You should be aware that information provided in response to this consultation, including personal information, may be published or disclosed in accordance with the access to information regimes, these are primarily the Freedom of Information Act 2000 (FOIA), the Data Protection Act 1998 (DPA) and the Environmental Information Regulations 2004. If you want the information [...]

→ Read more

4.2.5 Enquires

If you feel that this consultation does not satisfy these criteria, or if you have any enquires or comments about the process, please contact: Green Paper Consultation Enquires DGDC 5.N.25 MOD Main Building Whitehall London SW1A 2HB or E-mail: DGDCSecIP-Consultation@mod.uk and start your subject as ‘Enquiry’.

→ Read more